Master the OG0-092 TOGAF 9 Part 2 content and be ready for exam day success quickly with this Exambible OG0-092 test. We guarantee it!We make it a reality and give you real OG0-092 questions in our The-Open-Group OG0-092 braindumps.Latest 100% VALID The-Open-Group OG0-092 Exam Questions Dumps at below page. You can use our The-Open-Group OG0-092 braindumps and pass your exam.

Free OG0-092 Demo Online For The-Open-Group Certifitcation:

NEW QUESTION 1
Scenario: Zephyr Enterprises
Please read this scenario prior to answering the question
Zephyr Enterprises specializes in the development of wind turbine blades for use in large- scale commercial wind energy production systems. Zephyr has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Ontario. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturers design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. Zephyr has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
Zephyr has a mature Enterprise Architecture organization that is supported by a cross- functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
Zephyr has used TOGAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have recently updated to TOGAF 9 and have adapted the Zephyr Enterprise Architecture to closely follow the TOGAF 9 framework. All of Zephyrs IT architects have been trained and certified on TOGAF 9.Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and
deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.
Refer to the Zephyr Enterprises Scenario You are the Lead Architect for this activity.
You have been asked to recommend the best approach to adopt to address the Chief Engineer's concern.
Based on TOGAF 9, which of the following is the best answer?

  • A. You create an Architecture Contract to manage and govern the implementation and migration proces
  • B. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
  • C. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.You recommend that if a deviation from the contract is detected, the Manufacturing Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local need
  • D. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
  • E. You create an Architecture Contract to manage and govern the implementation and migration proces
  • F. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
  • G. For internal envelopment projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is detected, the Manufacturing Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.
  • H. You create an Architecture Contract to manage and govern the implementation and migration proces
  • I. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
  • J. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.You ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • K. You create an Architecture Contract to govern the implementation and migration process at each sit
  • L. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
  • M. You ensure that the contract addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management.You then schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definitio
  • N. Based on the results, you ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.

Answer: C

NEW QUESTION 2
Scenario: Armstrong Defense Industries
Please read this scenario prior to answering the question
Armstrong Defense Industries is the prime contractor for the Dreadnought Unmanned Aircraft System program.
Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. Armstrong Defense is moving aggressively to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.
To achieve this goal, Armstrong Defense needs to define Baseline and Target Architectures. These architectures must address key stakeholders concerns such as:
1. What groups of people should be involved in procurement-related business processes?
2. What current applications do those groups use?
3. Which procurement-related business processes are supported by zero, one, or many existing applications?
4. What are the overall lifetimes of the Request for Proposal and Purchase Order business objects?
5. What non-procurement applications will need to be integrated with any new procurement applications?
6. What data will need to be shared?
At present, there are no particularly useful architectural assets related to this initiative. All assets need to be acquired and customized or created from scratch. The company prefers to implement existing package applications from systems vendors with little customization.
The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle.
Armstrong Defense is using TOGAF for its internal Enterprise Architecture activities. It uses an iterative approach for executing Architecture Development Method (ADM) projects.
Refer to the Armstrong Defense Industries Scenario You are serving as the Lead Architect.
You have been asked to identify the most appropriate architecture viewpoints for this situation.
Based on TOGAF 9, which of the following is the best answer?

  • A. In the early iterations of the Architecture Definition:• Describe the Baseline Business Architecture with a Baseline Business Process catalog• Describe the Baseline Application Architecture with a Technology Portfolio catalog• Describe the Baseline Data Architecture with a Data diagram In the later iterations of the Architecture Definition:• Describe the Target Business Architecture with an Actor/Process/Data catalog• Describe the Target Application Architecture with a System/Technology matrix• Describe the Target Data Architecture with a Data Dissemination diagram
  • B. In the early iterations of the Architecture Definition:• Describe the Target Business Architecture with a Business Service/Function catalog and a Business Interaction matrix• Describe the key business objects with Product Lifecycle diagrams• Describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix• Describe the Target Data Architecture with a Data Entity/Business Function matrix and a System/Data matrixIn the later iterations of the Architecture Definition:• Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrix• Describe the Baseline Application Architecture with a System/Organization matrix and a System/Function matrix• Describe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • C. In the early iterations of the Architecture Definition:• Describe the Target Business Architecture with a Business Service/Function catalog and an Organization/Actor catalog• Describe the key business objects with Data Lifecycle diagrams• Describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix• Describe the Target Data Architecture with a System/Data matrix In the later iterations of the Architecture Definition:• Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrix• Describe the Baseline Application Architecture with an Application and User Location diagram and a System/Function matrix• Describe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • D. In the early iterations of the Architecture Definition:• Describe the Baseline Business Architecture with an Organization/Actor catalog• Describe the Baseline Application Architecture with a System/Function matrix• Describe the Baseline Data Architecture using a Data Entity/Data Component catalog In the later iterations of the Architecture Definition:• Describe the Target Business Architecture with en Organization/Actor catalog• Describe the Target Application Architecture using Application Communication diagrams end an Application Interaction matrix• Describe the Target Data Architecture with a System/Data matrix

Answer: B

NEW QUESTION 3
Scenario: Vittronics Ltd.
Please read this scenario prior to answering the question
Vittronics Ltd. is a leading medical device manufacturer in the highly competitive market for Migraine Headache Pain Management (MHPM) devices. These tiny wireless devices are implanted in the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the onset of a migraine headache.
This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries in the target markets.
The Enterprise Architecture group at Vittronics has been engaged in an architecture development project to create a Secure Private Immersive Collaborative Environment (SPICE) that will allow researchers at its product development laboratories worldwide to share information about their independent clinical trials.
The Vittronics Enterprise Architecture group is a mature organization that has been utilizing
TOGAF for several years. They have recently upgraded to TOGAF 9. The Vittronics Architecture Development Method (VADM) is strictly based on the TOGAF 9 Architecture Development Method (ADM) with extensions required to support current good manufacturing practices and good laboratory practices in their target markets.
The SPICE project team has now completed the Business, Information Systems, and Technology Architecture phases and has produced a complete set of deliverables for each phase. Due to the highly sensitive nature of the information that is managed in SPICE, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant for each domain. A corresponding SPICE Security Architecture has been defined.
The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. He has stated that the changes to the SPICE architecture will need to be rolled out on a geographic basis that will minimize disruptions to ongoing clinical trials. The work will need to be done in stages and rolled out in geographical regions.
Refer to the Vittronics Ltd Scenario
You are serving as the Lead Architect for the SPICE project team.
You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture(s).
Based en TOGAF 9, which of the following is the best answer?

  • A. Create an Implementation Factor Assessment and Deduction Matrix and a Consolidated Gaps, Solutions and Dependencies Matri
  • B. For each gap, identify a proposed solution and classify it as new development, purchased solution, or based on an existing produc
  • C. Group similar solutions together to form work package
  • D. Identify dependencies between work packages factoring in the clinical trial schedule
  • E. Regroup the packages into a set of Capability Increments scheduled into a series of Transition Architectures and documented in an Architecture Definition Increments Table.
  • F. Determine the set of Solution Building Blocks required by identifying which Solution Building Blocks need to be developed and which need to be procure
  • G. Eliminate any duplicate building block
  • H. Group the remaining Solution Building Blocks together to create the work packages using a CRLO matri
  • I. Rank the work packages in terms of cost and select the most cost-effective options for inclusion in a series of Transition Architecture
  • J. Schedule the roll out of the work packages to be sequential across the geographic regions.
  • K. Use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning too
  • L. For each gap classify whether the solution is either a new development, purchased solution, or based on an existing produc
  • M. Group the similar solutions together to define the workpackage
  • N. Regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the schedule for clinical trials.
  • O. Group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work package
  • P. Using the matrix as a planning tool, regroup the work packages to account for dependencie
  • Q. Sequence the work packages into the Capability Increments needed to achieve the Target Architectur
  • R. Schedule the rollout one region at a tim
  • S. Document the progression of the enterprise architecture using an Enterprise Architecture State Evolution table.

Answer: A

NEW QUESTION 4
RIG Networks, a global network supplier is implementing a massive replacement of its supply chain to reduce production cost of their new LTE (Long Term Evolution) gateways. As part of this renovation process the CIO decided to replace their ERP (Enterprise Resource Planning) system using a greenfield approach (where the legacy ERP system will be decommissioned). The CIO engaged a team of TOGAF 9 certified consultants to design the solution, he then identified the suppliers and asked you as Chief Architect to supervise the definition of the Architecture Design and Development Contract.
Refer to the scenario above
You now need to write the Architecture Design and Development Contract, identify how you would o this following TOGAF 9.
Choose one of the following answers

  • A. You would define the Architecture Design and Development Contract with : introduction and background, the nature of the agreement, scope of the architecture, architecture and strategic principles and requirements, conformance requirements, Target Architecture Measures, Define phases of deliverables, Prioritized joint workplan, Time window, Architecture delivery and business metrics.
  • B. You would define the Architecture Design and Development Contract with : introduction and background, the nature of the agreement, scope of the architecture, architecture and strategic principles and requirements, conformance requirements, Baseline Architecture definition, Target Architecture Measures, Define phases of deliverables, Prioritized joint workplan, Time window, Architecture delivery and business metrics.
  • C. You would define the Architecture Design and Development Contract with : Target Architecture Measures, Define phases of deliverables, Prioritized joint workplan, Time window, Architecture delivery and business metrics.
  • D. You would define the Architecture Design and Development Contract with : scope, goals, objectives and constraints, Architecture Principles, Baseline Architecture, Architecture Models, Gap Analysis, Impact Assessment.

Answer: A

NEW QUESTION 5
Scenario: Vittronics Ltd.
Please read this scenario prior to answering the question
Vittronics Ltd. is a leading medical device manufacturer in the highly competitive market for Migraine Headache Pain Management (MHPM) devices. These tiny wireless devices are implanted in the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the onset of a migraine headache.
This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries in the target markets.
The Enterprise Architecture group at Vittronics has been engaged in an architecture development project to create a Secure Private Immersive Collaborative Environment (SPICE) that will allow researchers at its product development laboratories worldwide to share information about their independent clinical trials.
The Vittronics Enterprise Architecture group is a mature organization that has been utilizing TOGAF for several years. They have recently upgraded to TOGAF 9. The Vittronics Architecture Development Method (VADM) is strictly based on the TOGAF 9 Architecture Development Method (ADM) with extensions required to support current good manufacturing practices and good laboratory practices in their target markets.
The SPICE project team has now completed the Business, Information Systems, and Technology Architecture phases and has produced a complete set of deliverables for each phase. Due to the highly sensitive nature of the information that is managed in SPICE, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant for each domain. A corresponding SPICE Security Architecture has been defined.
The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity.
Refer to the Vittronics Ltd Scenario:
You are serving as the Lead Architect for the SPICE project team.
As required by TOGAF, the SPICE project team res completed a Business Transformation Readiness Assessment in Phase A (Architecture Vision). In that assessment, it was determined that there are risks associated with the adoption of the Immersive Collaborative Environment. Despite a clear expression of the vision and the business need for utilizing SPICE to accelerate the clinical trials, the researchers have been resisting the change because of concerns about safeguarding individually identifiable information about the subjects who were participating in the trials.
You have been asked to recommend how this situation be managed in the implementation planning phases.
Based on TOGAF 9, which of the following is the best answer?

  • A. You decide that in Phase E, the team creates an overall solutions strategy that can guide the Target Architecture implementation and structure the Transition Architecture
  • B. You check that there is consensus before proceeding.
  • C. You decide to return to Phase A, where the team should brainstorm a technical solution that mitigates the residual risks presented by the privacy issu
  • D. Then, during Phase D, you will direct the team to develop an Architecture Building Block to manage the security risk
  • E. After that, the team should select Solution Building Blocks that mitigate all of the identified risks and revise the Requirements Impact Statement to reflect the changes to the high-level solutions strategy and migration plan.
  • F. You decide that in Phase E, the team review the Business Transformation Readiness Assessment and identify, classify, and mitigate the risks associated with the identified readiness factor
  • G. If the risks can be satisfactorily mitigated, then you would continue to define a high-level solutions strategy that includes the Transition Architectures needed to make the change culturally and technically feasible.
  • H. You decide that in Phase E, the team determines an approach to implementing an overall strategic direction that will address and mitigate the risks identified.

Answer: B

NEW QUESTION 6
Scenario:
Please read this scenario prior to answering the Question
You are the Lead Architect for a firm that manufactures ball bearings used in industrial equipment applications. They have manufacturing operations in several cities in the United States, Germany, and the United Kingdom.
The firm has traditionally allowed each manufacturing plant to drive its own production planning systems. Each plant has its own custom Materials Requirements Planning, Master Production Scheduling, Bill of Materials, and Shop Floor Control systems.
"Just In Time" manufacturing techniques are used to minimize wastes caused by excessive inventory and work in process. The increasingly competitive business environment has compelled the firm to improve its business capability to be more responsive to the needs of industrial customers. To support this capability, the firm has decided to implement an Enterprise Resource Planning (ERP) solution that will enable it to better coordinate its manufacturing capacity to match the demands for its products across all plants. In addition, there are also new European regulations coming into force to which their manufacturing processes must conform in the next six months.
As part of the implementation process, the Enterprise Architecture (EA) department has begun to implement an architecture process based on TOGAF 9. The CIO is the sponsor of the activity. The Chief Architect has directed that the program should include formal modeling using the Architecture Content Framework and the TOGAF Content Metamodel. This will enable support for the architecture tooling that the firm uses for its EA program.
The Chief Architect has stated that in order to model the complex manufacturing process it will be necessary to model processes that are event-driven. Also, in order to consolidate applications across several data centers it will be necessary to model the location of IT assets. In particular, the end goal is to have the single ERP application running in a single data center.
Currently the project is in the Preliminary Phase, and the architects are tailoring the Architecture Development Method (ADM) and Architecture Content Framework to fit into the corporate environment.
Refer to the Scenario
You have been asked to recommend a response to the Chief Architect's request to tailor the TOGAF Content Metamodel.
Based on TOGAF 9, which of the following is the best answer?

  • A. You recommend that the architecture team incorporate the Process Modeling and Infrastructure Consolidation extensions into their tailored Content Metamode
  • B. As the environment is process-centric this will enable them to model the manufacturing processes and store information to support regulatory complianc
  • C. It also includes views useful for managing the consolidation of applications into a single data center.
  • D. You recommend that the architecture team incorporate the Process Modeling and Governance extensions into their tailored Content Metamode
  • E. This is suitable as this is a significant IT change that will impact its operational model
  • F. This will ensure that they include specific entities and attributes that will allow them to model the event-driven nature of the manufacturing processes more precisely.
  • G. You recommend that the architecture team incorporates the Governance and Motivation Extensions into their tailored Content Metamode
  • H. This would allow modeling of the target milestones they want to achieve with this consolidation of application to a single data cente
  • I. These extensions will also enable demonstration of regulatory compliance for the manufacturing process.
  • J. You recommend that the architecture team incorporates the Data and Services Extensions into their tailored Content Metamode
  • K. This would allow modeling of the location of IT assets and ensure regulatory compliance for the manufacturing proces
  • L. It will also allow for identification of redundant duplication of capability which will be needed for a successful consolidation to a single data center.

Answer: A

NEW QUESTION 7
Magic Wand Corporation manufactures a range of equipment used by magician worldwide. The global popularity of a series of children’s books describing the formative years of a budding wizard and his various escapades at wizard school has driven unprecedented sales growth in the magical equipment market.
The current IT systems at Magic Wand are struggling to cope with the high volumes in this growth market. The CIO wants to persuade the board of Magic Wand Corporation to make a greater investment in the IT systems to cope with the new higher transaction volumes. On of the key components the CIOs wants to include when he approaches the board is a description of the current problems and how they may be addressed from an architectural point of view.
As the High Architect of Magic Wand Corporation, the CIO has delegated the task of
creating a vision for the future Architecture to you.
Which of the following answers best describes how TOGAF recommends delivering an Architecture Vision for the CIO?

  • A. Firstly, I ensure there is a Request for Architecture Work from the CI
  • B. Then I ensure that there is recognition for the architecture vision project by following any project management and programmed management frameworks used within the organizatio
  • C. I would identify the key stakeholders and engage with them to understand and document their concerns and high-level requirement
  • D. This would result in a stakeholder map used to support other deliverables such as the Architecture Vision, a Communications plan and a Statement of Architecture Wor
  • E. I would then identify the business goals and strategic drivers of the organization and define any enterprise or project specific constraints such as time and resource
  • F. I would then define the business capabilities of the organization needed to fulfill those business goals and drivers and their readiness for chang
  • G. Once complete, I would define the scope, confirm the architecture and business principles and develop the Architecture Visio
  • H. Following this, I would define the business case for the architecture project, assess the business risks and produce a risk mitigation pla
  • I. I would then define a plan of enterprise architecture work to meet the scope in the desired time line and the resources required and secure the support of stakeholders.
  • J. I would start by ensuring there is a Request for Architecture Work from the sponsor (the CIO). I would then create a project to define and deliver the architecture vision and the necessary output
  • K. The outputs include an approved Statement of Architecture Work, refined statements of Businesses Principles, Business Goals and Business Drivers, Architecture Principles, a Capability Assessment, a Tailored Architecture Framework, an Architecture vision, a Communications pla
  • L. The Statement of Architecture Work needs to be clear on the scope of architectural work, the resources needed to complete the work and amount of time it would take to complete the work assuming the scope of architectural work is agreed and that all the resources required are availabl
  • M. The final step would be to agree the Statement of Architectural Work with stakeholders confirming the scope, schedule and confirming the availability of the necessary resources.
  • N. I would start by establishing the architecture project and follow the appropriate project management metho
  • O. I would identify stakeholders their concerns and business requirements then confirm and elaborate the business goals, business drivers and constraint
  • P. I would then evaluate the business capabilities and readiness for business transformation and define the scop
  • Q. I would then develop the architecture vision, define the target architecture value proposition, KPIs and identify and mitigate all risks associated with the transformation effor
  • R. Finally, I would develop an Enterprise Architecture Plan and Statement of Work and secure approval from the relevant stakeholders.
  • S. I would approach this by defining and establishing the architecture team and governanc
  • T. This would be followed by agreeing and establishing the architecture principle
  • . I would select and customize an architecture framework changing any terminology and selecting the right phases and customizing the structure of content and outputs from the chosen metho
  • . Finally I would select and implement and architecture tool
  • . The outputs from this work would include an Organization Model for EnterpriseArchitecture, a Tailored Architecture Framework including method and content, the Architecture Principles, an initial architecture repository, restatement or references to business principles, business goals and business driver, a request for architecture work and the governance framework.

Answer: A

NEW QUESTION 8
Scenario:
Please read this scenario prior to answering the Question
You have been assigned the role of Lead Enterprise Architect for a manufacturing firm that specializes in musical instruments. The firm has been established for over 100 years, operating in North America for most of that time. In the last ten years, the firm has expanded into European markets and will soon establish a market in Latin America. A future expansion into the Asia Pacific region is also planned.
The firm is organized into several business units that each focus on manufacturing particular families of instruments such as brass, woodwind, and percussion. Each business unit has acquired other producers to expand its manufacturing capacity. This has resulted in a complex environment with a high diversity of business and manufacturing systems.
The Enterprise Architecture (EA) program within the firm has been functioning for several years. It has made significant progress in consolidating the technology portfolio and establishing key standards. The CIO and the COO are pint sponsors of the EA program. The EA program is mature, with an active Architecture Board and a well-defined architecture process and standard content templates based on the TOGAF 9 Architecture Content Framework. The EA process framework is well coordinated with the PMO, Systems Development, and Operations functions.
The firm has completed a strategic plan to reorganize its Sales & Marketing organization according to the four target geographic markets. One of the goals of this reorganization is to improve the ability of Marketing to collect more meaningful market analytics that will enable each sector to better address market needs with effective marketing campaigns and global product presence.
A Request for Architecture Work to address the goals of the reorganization has been approved. As the architecture team commences its work, the CIO has expressed concerns about whether the firm will be able to adapt to the proposed architecture and how to manage the associated risks.
Refer to the Scenario
You have been asked how to address the concerns of the CIO. Based on TOGAF 9, which of the following is the best answer?

  • A. In Phase B, the team should create a set of views that will enable them to identify the factors that will influence the successful introduction of the architecture into the organizatio
  • B. There should then be an assessment of each factor on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fi
  • C. Thesefactors can then be used to assess the initial risks associated with the proposed architecture.
  • D. In Phase A the team should analyze their risk by completing an Implementation Factor Assessment and Deduction Matrix to identify the particular risks associated with the implementation and deploymen
  • E. The matrix should include a list of factors to be considered, their descriptions, and constraints that should be taken into accoun
  • F. These factors can then used to assess the initial risks associated with the proposed architecture.
  • G. In Phase A, the team should use the Business Transformation Readiness Assessment technique to identify the factors that will influence the successful introduction of the architecture into the organizatio
  • H. The assessment should include determining the readiness rating for each factor based on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fi
  • I. These factors can then used to assess the initial risks associated with the proposed architecture.
  • J. In Phase A, the team should conduct a Business Scenario to identify the stakeholders' concerns and the resulting retirement
  • K. Once the retirements have been identified, they can be assessed in terms of their risk
  • L. The risks should be evaluated in terms of how they could be avoided, transferred, or mitigate
  • M. Any risks that cannot be resolved should be identified as residual risks and their disposition should be decided by the Architecture Board.

Answer: C

NEW QUESTION 9
Carter Woods, a global furniture firm, wants to improve the efficiency of its sales force by replacing their legacy configuration and ordering systems based on manual and paper based processes with an online ordering platform.
Carter Woods uses the Architecture Delivery Method from TOGAF 9. The CIO sponsored this activity and the Baseline Architecture was defined on the initial iteration defining: approach, scope and architectural vision including a set of architecture principles related to the Data domain:
✑ Data is an asset.
✑ Data is shared.
✑ Data is accessible.
A set of aspects to clarify arose from the business analysis from the assumption to replace the legacy systems with an online centralized one. These main concerns are:
· To identify the changes to existing business processes.
· To identify the data entities that can be shared among the sales agents.
· To clarify how to keep the data secured.
· To identify the list of non-sales application to be integrated with the sales applications Refer to the scenario above
You, as Lead Enterprise Architect, need to identify the most appropriate architecture viewpoints to address the concerns above mentioned.
Choose one of the following answers

  • A. Depict the Business Architecture using a Role catalog and a Process/Event/Control/Product catalo
  • B. Depict the Data Architecture using a System/Data matrix, a Data Entity/Data Component catalog and Data Security diagra
  • C. Depict the Application Architecture using an Interface catalo
  • D. Define the Technology Architecture via a Network Computing/Hardware diagram.
  • E. Depict the Business Architecture using a Business Interaction matrix and a Location catalo
  • F. Depict the Data Architecture using a Data Lifecycle diagram and a Data Migration diagra
  • G. Depict the Application Architecture using a Software Engineering diagra
  • H. Depict the Technology Architecture using a Communications Engineering diagram.
  • I. Depict the Business Architecture using a Business Footprint diagram and a Location catalo
  • J. Depict the Data Architecture using a Data Migration diagram, System/Data matrix and Data Lifecycle diagra
  • K. Depict the Application Architecture using an Application Communication diagra
  • L. Depict the Technology Architecture using a Network Computing/Hardware diagram.
  • M. Depict the Business Architecture using a Role catalog and Location catalo
  • N. Depict the Data Architecture using a System/Data matrix, Data Entity/Business Function matrix and Data Security diagra
  • O. Depict the Application Architecture using an Application Interaction matri
  • P. Define the Technology Architecture via a Network Computing/Hardware diagram.

Answer: A

NEW QUESTION 10
ARTI Dimensioning is a multinational that operates production facilities in 29 countries and sells its products in over 120 countries.
A consultancy firm has recommended a realignment that will enhance sharing of product information across business units. The implementation of this strategic realignment will require the development of integrated customer information systems and product information systems.
ARTI has a mature enterprise architecture practice and uses TOGAF 9 for the basis of the ARTI Architecture Framework (method and deliverables). The CIO is sponsoring an architecture development program that is going to start. The CIO is concerned about a potential disruptive result to the business of this activity and before proceeding with the architecture development he asked to evaluate the impacts on the company business.
Refer to the scenario above You are the Lead Architect and you have been asked to recommend an approach to address the concerns raised. Based on TOGAF 9 recommend which of the following is the best answer.
Choose one of the following answers.

  • A. Risk Aversion Assessment should be conducted during the Implementation Governance phase to determine the degree of risk aversion of the proposed business transformatio
  • B. After sharing the residual level of risk with the company chairman and the residual risk is not accepted, a set of parallel systems will be implemented to mitigate the risks.
  • C. Your recommendation is to use risk management techniques to assess the risks associated with the proposed business transformation and ensure the existence of business continuity plan
  • D. During the Implementation Governance phase you conduct a residual risk assessment to manage risks that cannot be mitigated.
  • E. During the Architecture Vision phase a risk assessment is conducted to mitigate initial risks and address those in the Architecture Contract signed in the Implementation Governance phase.
  • F. Your proposal is to utilize a risk management framework during the Implementation Governance phase to verify the risks associated with the proposed transformation of the busines
  • G. You then share with the concerned stakeholders the residual level on risk beforethe Architecture Contracts are released.

Answer: B

NEW QUESTION 11
Scenario: Glacier Ridge LLC
Please read this scenario prior to answering the question Glacier Ridge LLC is a vacation property management firm that is growing through acquisition. It manages over 200 resort properties across North America. Many of the resort properties use the same internal IT systems that they used before they were acquired. Until recently, the only requirement that has been placed en each property is that they use a standard financial reporting system to report their financials ID the headquarters on a weekly basis. The CEO has stated his concerns about the inefficiencies of the current approach and identified the need to change. He has defined a new strategic vision that will enhance the Glacier Ridge property business by standardizing its operations across the network to provide consolidated financial, human resources, logistics, sales and marketing, and yield management. He has also stated that he expects results by the end of the current fiscal year. These changes will provide the company with improved utilization of its capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the
marketing group to improve its ability to target advertising into key markets to improve yields. Glacier Ridge has mature enterprise architecture (EA) practice and uses TOGAF 9 as the method and guiding framework.
The CIO is the sponsor of the activity. In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire firm, including detailed requirements and recommendations.
Based on the recommendations from the initial engagement, Glacier Ridge has embraced an Architecture Vision to adopt an enterprise application that is tailored to the needs of the hospitality industry.
Refer to the Glacier Ridge scenario Your role is that of Chief Architect. You have been asked to recommend the best approach to take in this architecture engagement to realize the CEO's vision. Based on TOGAF 9, which of the following is the best answer?

  • A. Since the initial engagement has identified the need to change, you recommend that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.
  • B. Since the vision is well understood and the strategic architecture agreed, you recommend that the target architecture is defined first, followed by transition plannin
  • C. This will ensure that the current inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial architecture engagement.
  • D. You recommend that this engagement define the Technology Architecture first in order to assess the current infrastructure capacity and capabilit
  • E. Then the focus should be on transition planning and architecture deploymen
  • F. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.
  • G. You recommend that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strateg
  • H. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagemen
  • I. You would ensure that the target architecture addresses non-functional requirements so as to help forecast future impacts.

Answer: D

NEW QUESTION 12
UTrack Transports is a strong UK logistics company. The head of the strategic marketing division engaged the Principal Architect issuing a Request for architectural work to design an enhancement of the current Enterprise Data Warehouse system. An enhancement is needed to support the change in the business model; UTrack wants to leverage on customer data collected during business as usual activities and anonymize them to offer marketing agencies a fresh and accessible source of analytics data, this will increase the company revenues.
TOGAF 9 is the architectural framework in use.
Refer to the scenario above The Principal Architect has decided to ask you as Business Intelligence Subject Matter Expert to design the Data Architecture. The Chief Architect shared with you the Architecture Definition Document including the Business Architecture design. You now need to choose the artifacts you want to produce as part of the Data Architecture design. Identify the best answer accordingly to the TOGAF 9.
Choose one of the following answers

  • A. You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are store
  • B. You then classify what the data source are and the relationship with the data entities via a System/Data Matri
  • C. You finally identify common data requirements using a Data Lifecycle Diagram.
  • D. You first list the data used across the enterprise using a Data Entity/Data Component Matrix, including data entities and also the data components where data entities are store
  • E. You then classify what the data source are and the relationship with the data entities via a Role/System Catalo
  • F. You finally identify common data requirements using a Data Use Case Diagram.
  • G. You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are store
  • H. You then classify what the data source are and the relationship with the data entities via a System/Data Matrix.
  • I. You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are store
  • J. You then assign ownership of data entities to the organization via a System/Data Matrix.

Answer: A

NEW QUESTION 13
Patterns & Co. is introducing a Commercial Off-the-Shelf (COTS) Market Analytics solution in order to improve its new delivery service.
Patterns & Co. has a mature enterprise architecture capability and the CIO is the sponsor of the enterprise architecture team. The business vision and requirements for the new system are defined. It includes a detailed business process analysis. The supplier has proposed a solution but the Architecture Board identified some of the project requirements not consistent with the adopted infrastructure standards. The CIO considered the risks and approved the implementation.
The CIO has asked the EA team to execute the Phase G ensuring that the system performance KPIs are respected, the project remains within budget and security guidelines are met.
Refer to the scenario above As Lead Enterprise Architect you have to recommend a plan to implement the CIO decision. Choose the best answer according to TOGAF 9.
Choose one of the following answers

  • A. You ask the supplier to modify the web server hardware and software components so they can meet the current infrastructure standard
  • B. You advise to execute a proof of concept to anticipate any coding issu
  • C. Then, after the agreement with the development leads for supporting the development, you will provide the project plan to the project manager and develop an Architecture Contrac
  • D. A set of frequent operational reviews to monitor the solution's performance is then scheduled after the implementation is completed.
  • E. You recommend the co-existence of a second web server standard and modify the company Standards Information Base adding this new technology.You ask the project architects to create an Architecture Contract with the development team
  • F. You identify the need of a performance testing and a compliance review You agree with the business on SLA and delivery date
  • G. You identify re-usable procedures and objects.
  • H. You eliminate the non-standard web server from the solution as recommended by the Architecture Boar
  • I. You create a revised plan and Architecture Contract for the development stressing the re-use of standard technologie
  • J. You share the budget implication of this solution with a finance committee and inform the CIO of the long term cost benefits of this choic
  • K. You define periodical project management meetings to monitor compliance.
  • L. You execute a risk analysis and set deliverables and timing requirements with the development tea
  • M. You implement a detailed impact analysis of the chosen solutio
  • N. You create an Architecture Contract and ask for the CIO's approval before implementing i
  • O. You test the solution just prior to implementation and deliver the project artifacts and store after the completion of the implementation.

Answer: B

NEW QUESTION 14
Chiamin Metals is a leading world-wide manufacturer for continuous casting and bottom pouring powders. In addition to mould powders, the company also produces cored wire for secondary metallurgy. Chiamin Metals offers a variety of products and uses a paper-based catalog to sponsor them. A new CIO has joint the enterprise and has set up a team of Enterprise Architects following the TOGAF 9 practice. The main challenge is now to offer to Chiamin Metals customers a centralized and reliable entry point for their request via the implementation of a global online portal. This will allow the management of new marketing activities and will enable the new Chiamin Metals' ecommerce service.
Refer to the scenario above
You are the Chief Architect and the CIO asked you to present an Architecture Vision to address the above business problem. Identify the best answer accordingly to the TOGAF 9.
Choose one of the following answers

  • A. You identify key stakeholders, their concerns, and define the key business requirements to be addressed in the architecture engagement and generate a Stakeholder Ma
  • B. You Evaluate business capabilities and execute a Business Transformation Readiness Assessmen
  • C. You apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.
  • D. As requested by the CIO you focus on the Architecture Vision documentation and apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.
  • E. You create a high-level view of the Target Architectures and then present them to the CIO.
  • F. As requested by the CIO you focus on the Architecture Vision and create a detailed view of the Baseline Architecture
  • G. This is done for Business, Data, Application and Technology domains and then presented to the CIO using the Architecture Definition Document.

Answer: A

NEW QUESTION 15
Scenario: Zephyr Enterprises
Please read this scenario prior to answering the question
Zephyr Enterprises specializes in the development of wind turbine blades for use in large- scale commercial wind energy production systems. Zephyr has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Ontario. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturers design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. Zephyr has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
Zephyr has a mature Enterprise Architecture organization that is supported by a cross- functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
Zephyr has used TOGAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have recently updated to TOGAF 9 and have adapted the Zephyr Enterprise Architecture to closely follow the TOGAF 9 framework. All of Zephyrs IT architects have been trained and certified on TOGAF 9.Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.
Refer to the Zephyr Enterprises Scenario:
You have been assigned by the Lead Architect for the Automated Test System controller project to conduct Compliance Assessments at each manufacturing plant.
During the course of the assessment at the Omaha plant, you discover that the Distributed Data Acquisition System they have purchased uses a proprietary Remote Procedure Call (RPC) that utilizes kernel mode threads instead of the user mode threads that are specified in the Architecture Definition Document. In all other respects, the system meets the requirements stated in the Architecture Definition Document and seems to perform correctly.
You have been asked to describe the compliance of this system for the final report. Based on TOGAF 9, which of the following is the best answer?

  • A. You observe that all of the features in the Architecture Definition Document have been implemented in accordance with the specification, except for the RPC mechanis
  • B. Your recommendation is that the system be described as conformant.
  • C. You observe that the system has many features in common with the Architecture Definition Document, and those features have been implemented in accordance with the specificatio
  • D. However, you note that the RPC mechanism has been implemented using features that are not covered by the specificatio
  • E. Your recommendation is that the system be described as consistent.
  • F. You observe that the implementation of the RPC mechanism has no features in common with the Architecture Definition Document, therefore the question of its conformance should not be considere
  • G. Your recommendation is that the system be described as consistent.
  • H. You observe that the system meets most of the requirements stated in the Architecture Definition Document and appears to work correctl
  • I. However, you note that the RPC mechanism has not been implemented according to the specificatio
  • J. Your recommendation is that the system be described as non-conformant.

Answer: D

NEW QUESTION 16
TotalComms is a telecommunications company formed from the merging of other 2 telecommunication companies. The business operating model has been unified, the TOGAF 9 Architecture Board approved the outline Implementation and Migration Plan the detailed migration planning must know be approved. Your help is needed to work on the migration planning with all the key stakeholders to achieve an agreement.
Refer to the scenario above
You are the Lead Architect asked to describe accordingly to TOGAF 9 the best way to address the following activities:
✑ The way the migration planning is conducted.
✑ What is going to be implemented.
✑ The stakeholders involved in the implementation.
✑ The definition of the deliverables to use
Choose one of the following answers

  • A. The Chief Architect will conduct the Migration planning and then share it with the other domain architects.The migration plan will be formed by a list of projects, their priority, their costs and a recommendation on how to procee
  • B. After the plan is shared with the Architectural Board members and any observation that may raise incorporated in the plan, any individual project will go in front of the board for the approval for resources for the next project incremen
  • C. A GANT chart will be included to be used as a roadmap.
  • D. The Migration planning will be conducted as a series of steps: confirming and then coordinating the corporate management frameworks involved; establishing clear business value for the deliverables; creating detailed resource estimates for the work to do; define priority of the work, sequence and then the Transition Architecture
  • E. After this, an Implementation and Migration Plan can be confirme
  • F. The Portfolio Management, Operations Management and Business Planning teams should be involved in the implementation of the major deliverable
  • G. Once these have been completed, regular meetings will be done to enable the architecture to be kept up-to-date.
  • H. Implementation and Migration Strategy will be used to define project plans focusing on scope, time and budge
  • I. The business value of each project is assessed and Project Managers will prepare submissions to the IT governance Board to ask for their funding and the Lead Architect will be active part of the boar
  • J. The collection of project roadmaps and plans will be used to detail the EA Implementation and Migration Plan.
  • K. This step will be conducted by the Enterprise Architecture team involving Business, Application, Data, Technology, and Security architect
  • L. They will implement the TransitionArchitectures and together will prioritize a list of activities and include the Architecture Building Blocks in an Implementation and Migration Plan and Roadma
  • M. After this, the comments on the deliverables shared with lines of business and the members of the Executive Board are integrated, this to enable the funding on the Enterprise Architecture work.

Answer: B

NEW QUESTION 17
......