The perfect sample size is the minimum number of data points required to provide exactly 6% overlap or risk if one wants a 95% confidence level.
Correct Answer:
B
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.
Correct Answer:
A
A Lean Principle that addresses efficiency by the process worker is called __________?
Correct Answer:
D
Lean Enterprise is based on the premise that anywhere work is being done which of these is also occurring?
Correct Answer:
B
Hypothesis Testing can help avoid high costs of experimental efforts by using existing data.
Correct Answer:
A